Integral Irrigation and Reinforced Macrotunnel Greenhouse Project in Huelva experimental farm

16 January 2025 | Int. Greenhouse Guide | Sanjorge

Sanjorge is immersed in the intermediate phase of a new integral project, consisting of the manufacture and installation of a reinforced Macrotunel greenhouse and a fertigation head in a mobile house assembled to a maritime container, located in an experimental farm in the province of Huelva.
The great advantage of using fertigation equipment lies in achieving optimum conductivity for the crop at all times of application, in addition to distributing the right amount of water and fertilizer to the crop at the optimum time and homogeneously, achieving an increase in production and crop quality.


The Macrotunel Reinforced greenhouse manufactured by Sanjorge in addition to requiring less initial investment in structures, are more resistant to the meteorological inclemencies thanks to the installation of a series of reinforcements adapted to the necessities of the client, type of culture and climate.

Contact our sales team and besides receiving personalized attention, know all the advantages and novelties of this type of greenhouse.

Click here for more company info
You can find this item in our free magazine.

Related items

Water, Sanjorge’s challenge for the farmer to have alternatives available

Water is the key element in any agricultural installation. The lack, excess and conditions of this element can be limiting factors for an optimal and quality production. In ...
27 January 2025

Integral Irrigation and Reinforced Macrotunnel Greenhouse Project in Huelva experimental farm

Sanjorge is immersed in the intermediate phase of a new integral project, consisting of the manufacture and installation of a reinforced Macrotunel greenhouse and a fertigat...
16 January 2025

Sanjorge will present its new products one more year at Fruit Attraction 2024

Once again, Sanjorge will be present at the international reference fair of the fruit and vegetable sector held at IFEMA Madrid, Fruit Attraction 2024. Fruit Attraction has b...
18 September 2024

Contact information

U Gaat Bouwen
Langpoort 2
6001 CL Weert, NL
+31 495 545 060
info@ugaatbouwen.nl
www.ugaatbouwen.com